© willyto1286 (CC BY-SA)
Medal - Inauguration Central Hidroeléctrica 3 de Febrero Finalización Proyecto Hidroeléctrico El Chaparral
2023 year| Silver (.925) plated copper | 33 g | 40 mm |
| Location | El Salvador |
|---|---|
| Period | Republic (1841-date) |
| Type | Commemorative medals › Inauguration medals |
| Year | 2023 |
| Composition | Silver (.925) plated copper |
| Weight | 33 g |
| Diameter | 40 mm |
| Thickness | 3 mm |
| Shape | Round |
| Technique | Milled |
| Orientation | Medal alignment ↑↑ |
| Updated | 2024-11-12 |
| Numista | N#386309 |
|---|---|
| Rarity index | 100% |
Reverse
The reservoir and the dam of the hydroelectric power plant.
Script: Latin
Lettering: EL SALVADOR 2023
Engraver: Ansen Crafts
Designers: José Luis Flores Romero, William Guillermo Romero Martínez
Edge
Serial Number
Price
| Date | Mintage | VG | F | VF | XF | AU | UNC |
|---|---|---|---|---|---|---|---|
| 2023 | 115 | - | - | - | - | - | - |
Values in the table are based on evaluations by sales realized on Internet platforms. They serve as an indication only for Medal - Inauguration Central Hidroeléctrica 3 de Febrero (Finalización Proyecto Hidroeléctrico El Chaparral) 2023 item.